Logo

You already have an unfinished Quote for this Bid. Would you like to continue working on that Quote?

Bid Solicitation: B-27-SOHDOD-00000395

Header Information

Bid Number: B-27-SOHDOD-00000395 Description: Repaving HIARNG B119J POV Lot 8 Bid Opening Date: 08/26/2026 11:00:00 AM
Purchaser: James Barbour Organization: Department of Defense
Department: DOD03 - Hawaii Army National Guard Division (State) Location: ARMYN - Hawaii Army National Guard Division (State)
Fiscal Year: 27 Allow Electronic Quote: Yes
Alternate Id:   Required Date: Available Date :  08/05/2026 11:00:00 AM
Info Contact: Jim Barbour 808-672-1501 Bid Type: OPEN Informal Bid Flag: No
Purchase Method: Contract
Begin Date: 09/25/2026 End Date: 11/27/2026
Pre Bid Conference: 3:30 PM on 7 AUG
Bulletin Desc: This project consists of demolishing existing pavement and subsurface of the parking lot which is approximately 13,000 sqft going 9" down and installing the same square footing (3250 cubic feet) of State-Mix IV hot-mix asphalt (HMA) on top of new base course (6500 cubic feet). Installation is to be conducted per Project Plans sections (see 1.2 & 1.3) of this scope of work.
Ship-to Address: James Barbour
3949 Diamond Head Road
Honolulu, HI 96816
US
Email: james.l.barbour@hawaii.gov
Phone: (808) 672-1501
Bill-to Address: James Barbour
3949 Diamond Head Road
Honolulu, HI 96816
US
Email: james.l.barbour@hawaii.gov
Phone: (808) 672-1501
Print Format:
File Attachments: AG_008 103D Terms_Conditions.pdf
Mandatory_Vendor_Instructions_for_Aloha_eBUYS_Solicitation.pdf
POV_08_Scope.pdf
Drawings POV8.pdf
POV_08_AlohaEbuy Construction Offer Form.docx
Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Allow Vendors to submit Questions?: Yes
Question Due Date: 08/07/2026 08:00:00 AM
Answer Publish Date: 08/10/2026 01:00:00 PM
Procurement Officer: Rusty Spray
Solicitation Type: Construction
Method of Procurement: Small Purchase
Project Title: Repaving HIARNG B119J POV Lot 8
Project Number: CFMOJB104
Department Solicitation No.:
Questions:
Question # Print Sequence Required Question Response
1 1.0 No Are you a good contractor?                    

Item Information

Item # 1:   ( 913  -  27 )   The Contractor shall provide all labor, tools, equipment, and materials to perform all work related to: 1) Excavating approximately 9,750 CF of existing pavement and course material, 2) Prepping and installing approximately 6,500 CF base course and compacting to grade indicated on drawings 3) Applying a layer of tack coat (bitumen-based) 4) Paving a 3" thick layer of HMA (~3250 CF of State Mix IV) 5) Painting the parking lines and stop sign line 6) Installing new stop sign on island shown on drawings. Grading all terrain so runoff drains towards the two drain inlets
NIGP Code: 913-27
   Construction, Highway and Road
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   JOB - Job    
Manufacturer: Brand: Model:
Make: Packaging:
 
Item # 2:   ( 909  -  24 )   Part of number 1
NIGP Code: 909-24
   Building Construction, Commercial and Institutional
Qty Unit Cost UOM Total Discount Amt. Total Cost
1.0   JOB - Job    
Manufacturer: Brand: Model:
Make: Packaging:
 
Copyright © 2026 Periscope Holdings, Inc. - All Rights Reserved.
Quote # Description Date Last Modified Status